The BrightMaster 3800S supports semi-automated floor coating in underground parking garages, factory workshops, laboratories and sports venues. One platform covers primer, intermediate-coat and topcoat stages. Contractors can assess it as part of the complete floor process, matching the tool and settings to the material used at each stage.
The modular design accepts scraping and roll-coating end tools. Water-based and solvent-based coatings are supported; the exact formulation should be selected against the floor-system requirements. Project planning should connect substrate preparation, layer sequence and work-zone handover so that machine movement follows the agreed coating process.
Process parameters are preset through an app. The robotic arm carries out coating while the operator steers the chassis and replenishes material. This division of tasks suits sequential treatment of large areas: the operator guides the machine and maintains the material supply while the tool performs its repetitive application movement automatically.
The end tools adapt dynamically to the floor to maintain contact. Linked process controls support coating-consumption control with a stated accuracy of ±15%. Construction statistics and FMS cloud data management provide operating records that can support shift organization and the handover of completed areas between teams.
Maximum working width is 3.2 m with the scraping tool and 3.8 m with the roll-coating tool. The brochure gives an overall operating-width range of 1.6-3.8 m. Because tool selection changes the treated strip, machine position, turns and access around columns should be planned for each process stage. The material tank holds 32 L; locate replenishment points with regard to the route and access through untreated areas.
BrightMaster lists net efficiency of up to 300 m²/h and a single-shift area of 2,000 m². These are manufacturer performance references to assess against the actual site. A working schedule also needs to include material preparation, tank filling, transfers between areas and treatment at coating boundaries, all of which influence completed area per shift.
The machine has a 48 V, 100 Ah battery and rated power of 3.0 kW. Charging input is AC 220 V at 16 A. Stated operating endurance is at least 6 hours. For shift planning, relate this figure to the selected tool, coating and load profile, and allow suitable access and time for charging alongside the material-handling schedule.
Maximum moving speed is 0.7 m/s, equivalent to 2.52 km/h. The listed maximum climbing angle is 12°, maximum obstacle height is 50 mm and maximum trench-crossing width is 50 mm. These specifications help assess connections between work zones: identify joints and level changes on both the machine route and material-delivery route before coating begins.
The 3800S measures 2580×1000×1700 mm in length, width and height. Its unloaded mass is 450 kg. Delivery planning should check door openings, lifts, corners and the load limits along the route. During operation, also allow space for the working tool, the full application strip and operator access to the material tank.
For selection, prepare a floor plan, the area involved at each coating stage, the coating specification and access restrictions. This gives the team a basis for choosing the scraper or roller, planning strip widths and locating replenishment points. The machine schedule can then be aligned with coating intervals and the inspection of the finished floor.